Team number 21
Find out more!

About the project

The aim of the project is to create a system for monitoring vehicles in urban areas using camera technology, edge computing (counting directly on end devices), machine learning, and IoT platforms. The role of the system is to record and evaluate vehicle behavior information in the track section to help optimize traffic by, for example, identifying "busy hours" based on the length of vehicle stagnation or detecting the entry of an unauthorized vehicle into a designated location.

Vehicle tracking

We will replace the manual analysis of vehicle behavior in an automated way, allowing for a more accurate recording of traffic events..

Edge computing

Thanks to the processing of video stream directly on the end device, we can save costs and send the already evaluated data to the cloud.

Optimizing traffic

The obtained data will be usable, for example, to improve urban systems such as the SmartParking platform (zaparkuj.to) or directly to optimize traffic.

Our team

Ivan SRBA

Project leader

Matej GROMA

Developer

Matej HORVÁTH

Computer Vision & Algorithms

Peter JURKÁČEK

Scrum Master

Jozef KAMENSKÝ

Full-stack Developer

Adam KŇAZE

Computer Vision & Algorithms

Kristína MACKOVÁ

Developer

Lenka PEJCHALOVÁ

Graphic Designer, Front-End Developer

Jakub SEDLÁŘ

Git master, Developer

Step 1: Write a methodology of something.
Step 0: Write a methodology of how to write a methodology first.
Step -1: Write a methodology of how to write a methodology on how to write a methodology first.
Step -2: Write a methodology of how to write ...

What's new

  • Sprint 1 - Alomomola

    Meeting with product owners, configuring servers and IDEs.

  • Sprint 2 - Bulbasaur

    Starting development of all application components (AI camera module, BE / FE server)

  • Sprint 3 - Caterpie

    Display the number of transits from the monitored area on the web based on camera generated events.

  • Sprint 4 - Diglett

    Allowing the user to modify the configuration of the monitored area to the camera using annotations and display the transition histogram for the monitored area.

  • Sprint 5 - Eevee

    MVP

  • Sprint 6 - Flaaffy

    Integrate HERE maps and livestream from camera

  • Sprint 7 - Gastly

    Finish the livestream, implement keypoint-tracking, unify design according to design manual.

  • Sprint 8 - Hitmonlee

    Visualization of passes between zones in maps and photos of the intersections.

  • Sprint 9 - Illumise

    Visualization of movements and stalls of vehicles via trajectories and heat maps, deployment of the software on a real camera device.

  • Sprint 10 - Jigglypuff

    Improved perfomance by aggregating movement data, design tweaks.

  • Sprint 11 - Kabuto

    Visualization of transit volume over time, GPU acceleration.

Documents

Reports

Winter semester

Description Date Download
Report 1 28. 09. 2018
Report 2 05. 10. 2018
Report 3 12. 10. 2018
Report 4 19. 10. 2018
Report 5 26. 10. 2018
Report 6 09. 11. 2018
Report 7 16. 11. 2018
Report 8 23. 11. 2018
Report 9 30. 11. 2018
Report 10 07. 12. 2018
Report 11 14. 12. 2018

Letný semester

Popis Dátum Stiahni
Report 12 12. 2. 2019
Report 13 19. 2. 2019
Report 14 26. 2. 2019
Report 15 5. 3. 2019
Report 16 12. 3. 2019
Report 17 19. 3. 2019
Report 18 26. 3. 2019
Report 19 2. 4. 2019
Report 20 9. 4. 2019
Report 21 16. 4. 2019
Report 22 30. 4. 2019
Report 23 7. 5. 2019

Tasks export

Winter semester

Description Date Download
Tasks export 1.sprint 24. 11. 2018
Tasks export 2.sprint 24. 11. 2018
Tasks export 3.sprint 24. 11. 2018
Tasks export 4.sprint 12. 12. 2018
Tasks export 5.sprint 12. 03. 2019

Summer semester

Popis Dátum Stiahni
Tasks export 6.sprint 03. 03. 2019
Tasks export 7.sprint 10. 05. 2019
Tasks export 8.sprint 10. 05. 2019
Tasks export 9.sprint 10. 05. 2019
Tasks export 10.sprint 10. 05. 2019
Tasks export 11.sprint 10. 05. 2019

Summarization of sprints

Winter semester

Popis Dátum Stiahni
Summary of 1. sprint 24. 11. 2018
Summary of 2. sprint 24. 11. 2018
Summary of 3. sprint 24. 11. 2018
Summary of 4. sprint 12. 12. 2018
Summary of 5. sprint 12. 3. 2019

Summer semester

Popis Dátum Stiahni
Summary of 6. sprint 03. 03. 2019
Summary of 7. sprint 10. 05. 2019
Summary of 8. sprint 10. 05. 2019
Summary of 9. sprint 10. 05. 2019
Summary of 10. sprint 10. 05. 2019
Summary of 11. sprint 10. 05. 2019

Methodics

Description Date Download
Methodics of deployment 27. 03. 2019
Methodics of code 23. 11. 2018
Methodics of tasks 23. 11. 2018
Methodics of communication 23. 11. 2018
Methodics of git 23. 11. 2018
Methodics of testing 14. 12. 2018
Methodics of documenting 14. 12. 2018
Methodics of design 10. 5. 2018

Submitted documents

Description Date Download
Motivation documment 19. 09. 2018
TP Cup application 18. 10. 2018
Mentoring materials 18. 11. 2018
9 weeks report 23. 11. 2018
Big picture - Project mangement 14. 12. 2018
Big picture - Engineering product 14. 12. 2018
System modules 14. 12. 2018
Installation guide 14. 12. 2018
Swagger - backend documentation 10. 5. 2019
Javadoc - backend documentation 10. 5. 2019
SchemaSpy - database documentation 10. 5. 2019
JSDoc - frontend documentation 10. 5. 2019
Final installation guide 10. 5. 2019
User guide 10. 5. 2019
Big picture - Engineering product (final) 10. 5. 2019
System modules (final) 10. 5. 2019
Big picture - Project mangement (final) 10. 5. 2019

Project realized in collaboration with: